T-M-4C

PEDESTRIAN GATEWAY TREATMENT
T-M-4C

(Click image to open PDF)

Latest Revision Note

XX/XX/20XX    NEW STANDARD DRAWINGS

Related Standard Drawings

DRAWINGDESCRIPTIONREMARKS
T-M-4STANDARD INTERSECTION PAVEMENT MARKINGSFOR SIGN SPACING, CROSSWALK MARKING, AND UNSIGNALIZED MID-BLOCK CROSSING DETAILS
   
   

Related Item Numbers

ITEM NO.U/MDESCRIPTION
713-15.40LSSIGN INSTALLATION (DESCRIPTION)
716-02.03L.F.PLASTIC PAVEMENT MARKING (CROSS-WALK)
   

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
05-01-2022
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402

This Page Last Updated: July 12, 2024 at 11:37 AM