EC-STR-13

ROCK AND EARTH SEDIMENT EMBANKMENT
EC-STR-13

(Click image to open PDF)

Related Standard Drawings

DRAWINGDESCRIPTIONREMARKS
EC-STR-1DEWATERING STRUCTUREROCK SEDIMENT DAM IMPOUNDMENTS SHOULD BE DEWATERED WITH A DEWATERING STRUCTURE.
EC-STR-2SEDIMENT FILTER BAGSROCK SEDIMENT DAM IMPOUNDMENTS SHOULD BE DEWATERED WITH A SEDIMENT FILTER BAG.
   

Related Item Numbers

ITEM NO.U/MDESCRIPTIONREMARKS
203-01C.Y.ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) 
209-05C.Y.SEDIMENT REMOVAL 
709-05.06TONMACHINED RIP-RAP (CLASS A-1) 
740-10.03S.Y.GEOTEXTILE (TYPE III)(EROSION CONTROL) 
801-01.07UNITTEMPORARY SEEDING (WITH MULCH) 

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
10-26-1992 | 12-18-1995 | 05-27-2001 | 12-18-2002 | 01-22-2003 | 04-15-2006 | 04-01-2008 | 08-01-2012
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: July 12, 2024 at 11:37 AM