EC-STR-1

DEWATERING STRUCTURE
EC-STR-1

(Click image to open PDF)

Related Standard Drawings

DRAWINGDESCRIPTIONREMARKS
EC-STR-2SEDIMENT FILTER BAGSPOSSIBLE USE OF SEDIMENT FILTER BAG
EC-STR-3CSILT FENCE WITH WIRE BACKINGSEE STANDARD DRAWING FOR INSTALLATION DETAILS
EC-STR-3ESILT FENCE FABRIC JOINING DETAILSSEE STANDARD DRAWING FOR INSTALLATION DETAILS

Related Item Numbers

ITEM NO.U/MDESCRIPTIONREMARKS
203-01C.Y.ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) 
209-05C.Y.SEDIMENT REMOVAL 
209-10.01C.Y.TEMPORARY DEWATERING STRUCTURE 

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
10-26-1992 | 12-18-1995 | 10-26-2000 | 05-27-2001 | 12-18-2002 | 01-22-2003 | 04-01-2008 | 08-01-2012
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402